Barratt Homes Headwalls

We have recently supplied 8No. SFA15B Headwalls complete with 650 x 300mm toes, Kee Klamp Handrail and SFA Outfall Safety Grilles to Barratt Homes in Uttoxeter. The contractor took some great photos showing the installation process of the headwalls from start to finish.

New build housing estates in the UK are incorporating balancing ponds or also known as attenuation ponds into estates which form part of the sustainable drainage know as SuDs. It's in these balancing ponds that you will often find our precast concrete headwalls at the end of the pipe line. A balancing pond is designed to control the amount of excess water entering the drainage system to help prevent future flooding.

Barratt Homes Headwalls